Portal Home > Electrical > DG Set Sizing
Tool 4: Standby Generation

Preliminary Industrial DG Set Capacity Screening Estimator

Sizes diesel generator kVA capacity from base linear and motor loads, accounts for starter inrush (DOL, Star-Delta, Soft Starter, VFD), and selects standard commercial ratings within the ISO 8528 classification framework.

✔ 1. Formula Verified → ⚡ 2. Engineering Screening → 📐 3. Commercial Ratings (ISO 8528 Framework) → ⚖ 4. Engineer Review Required
⚙ Facility Generator Loads
kW
Modeled at nominal 0.90 power factor.
kW
Modeled at nominal 0.80 running power factor.
kW
Motor representing the peak transient step-starting inrush.
Inrush Factor
📊 Generator Sizing Sheet
Preliminary Screening
Selected Standard Commercial DG Rating
380 kVA
Minimum Sizing Target: 320.31 kVA
Steady Running Apparent Power
256.25 kVA
Peak Motor Starting Inrush
140.62 kVA
Rated Full-Load Current at 415V
528.66 A
💬 Request DG Set Quotation on WhatsApp

Commercial Sizing Methodology & Emission Compliance

Commercial Ratings & ISO 8528 Framework

  • Commercial DG Rating Schedule: Standard manufacturer market rating steps (15, 25, 30, 45, 62.5, 82.5, 100, 125, 160, 200, 250, 320, 380, 400, 500, 600, 625, 750, 1000, 1250, 1500, 2000 kVA) used for preliminary commercial selection.
  • ISO 8528-1: 2018 Framework: Classifies generating sets by application (Emergency Standby Power - ESP, Prime Power - PRP, Continuous Operating Power - COP, Data Centre Power - DCC).
  • CPCB-IV+ Emission Note: Central Pollution Control Board Stage IV+ regulations enforce statutory emission limits (PM, NOx, CO, HC) for engines up to 800 kW. Compliance is a statutory procurement mandate in India.

Screening Equations

S_run = (P_linear / 0.90) + (P_motor / 0.80) [kVA]
S_start = (P_largest / 0.80) × K_starter [kVA]
S_target = max(S_run / 0.80, S_run + 0.35 × S_start)

Inrush factors: DOL (6.0×), Star-Delta (2.5×), Soft Starter (3.0×), VFD (1.2×). The 80% continuous load limit (S_run / 0.80) is an explicit engineering/design utilization assumption to provide thermal headroom, NOT a universal mandatory ISO 8528 requirement. Final set selection must remain manufacturer and project verified.

⚖ Statutory Notice & Engineering Disclaimer (Tier D Integration)

This calculation provides preliminary engineering screening. Project-specific DG set selection requires transient voltage dip analysis (≤ 15–20%), transient frequency dip analysis (≤ 8–10%), alternator subtransient reactance ($X''_d$), step-load sequencing, and site de-rating for temperature ($>40^\circ\text{C}$) and altitude ($>1000\text{m}$) verified by a licensed engineer.